About the job
The project was a joint work between the engineering and construction departments of BAIPRO IngenierÃa & Construcción S.A.
It consisted in the design of a firefighting system to protect a new 1500 kVA transformer ready for installation. The system included a perimeter spray system, a control
post for the deluge system and the fire water piping (aerial and underground).